In a major step towards strengthening railway safety and modernising signalling infrastructure, Indian Railways has approved the replacement of relay-based interlocking with advanced Electronic Interlocking (EI) at 20 locations in Malda Division of Eastern Railway at a cost of ₹274 crore.
The project will replace the existing Relay Room/Panel Interlocking (PI/RRI) system with Electronic Interlocking (EI) at 18 railway stations and 2 Intermediate Block Signalling (IBS) locations situated on High Utilisation Network (HUN) routes of Eastern Railway.
The sanctioned project covers the replacement of conventional relay-based signalling systems with state-of-the-art Electronic Interlocking technology across 20 operational locations.
Related current affairs
- Indian Railways sanctions ₹432 crore electronic interlocking project on Eastern Railway’s HDN/HUN routes
- Indian Railways approves ₹170 crore for Kavach 4.0 on remaining 712 Rkm of Moradabad Division
- Railways to Prevent Trespassing: Safety Fencing Provided Along 19,700 km of Railway Tracks
- SC raps Railways to look into issue of overcrowded trains
- Indian Railways sanctions ₹125 crore Bhavnagar Para Yard Remodeling project in Gujarat
- Indian Railways Approves ₹272 Crore Adra–Joychandipahar Bypass Line to Boost Freight Capacity
