The Cabinet Committee on Economic Affairs approved the construction of the 117.7 km Kanpur-Kabrai Access-Controlled Greenfield Highway. This four-lane highway is designed for future six-laning and is part of the Bhopal-Kanpur Economic Corridor.
The project, costing Rs.7145.14 crore, will be implemented by the National Highways Authority of India (NHAI) using the BOT (Toll) model. It aims to provide high-speed connectivity between Kanpur and Kabrai, reducing travel time from 3.5 hours to 1.5 hours.
Related current affairs
- India's High-Speed Rail Future:Building a Standardised Path for Expansion
- Cabinet approves the construction of 4/6 lane Access-Controlled Kanpur-Kabrai section of NH-34 in Uttar Pradesh on BOT (Toll) Mode at total Capital Cost of Rs.7145.14 crore
- Gati Shakti Multi-Modal Cargo Terminal policy: 142 GCTs commissioned; IPAs for 310 more locations
- Performance improvements in port sector KPIs over the last decade (MIV 2030)
- Progress Review and Status of National High-Speed Corridors and Greenfield Expressways
- उद्घाटन समारोह: 46.26 करोड़ की लागत से “भगदह घाट, नौजर घाट एवं महबीर घाट” (मनीनिय/भिर)
