What happened

Indian Railways approved the provision of Electronic Interlocking (EI) at 21 stations of Samastipur Division of East Central Railway (ECR) at a total cost of ₹233 crore.

The approved work involves replacement of existing Panel Interlocking with Electronic Interlocking at these 21 stations.

Indian Railways stated that the modern signalling system will strengthen railway signalling infrastructure across the division and facilitate implementation of Kavach, the indigenous Automatic Train Protection system.

Background and earlier position

Railway signalling relies on interlocking systems that control how signals and points (switches) work together, reducing the risk of unsafe train movements.