What happened
The Union Cabinet approved the development of a 46.039 km six-lane Greenfield Ganga Elevated Corridor in Varanasi, Uttar Pradesh, to ease road congestion and improve connectivity. The corridor is planned between NH-19 and the Varanasi Ring Road (NH-135B), with ramps, loops, and an extradosed Foot Over Bridge-cum-bridge, at a total capital cost of ₹14,447.64 crore.
Background and earlier position
Varanasi faces mounting pressure on its urban transport network due to rising numbers of tourists and pilgrims. Congestion on key arterial roads often increases travel times to major religious, educational and cultural landmarks and also affects residents and logistics, creating a need for infrastructure that can move passenger and freight traffic more efficiently through and across the city.
What changed now (project design and scope approved by the Cabinet)
The approved Greenfield Ganga Elevated Corridor is designed as a high-speed, access-controlled urban corridor connecting NH-19 and the Varanasi Ring Road with Ramnagar, Banaras Hindu University (BHU), and other key destinations. The project is expected to connect major tourist and religious nodes such as the Kashi Vishwanath Temple, the ghats of Varanasi, Namo Ghat, Ramnagar Fort, and Kashi Railway Station.
Related current affairs
- NHAI and National Road Safety Board deliberate on strengthening road safety on National Highways
- Government initiatives to boost highway infrastructure investment through HSCs/expressways and PPP reforms
- NH 44, 200-core Kanpur–Lucknow expressway issues: ‘2,400-’ investigation/claims
- Excavated in 1957, Varanasi skeleton could reveal who lived here 1,000 yrs ago
- MoSPI PAIMANA monitoring: 1,847 Central Sector infrastructure projects worth ₹40.54 lakh crore tracked as of June 2026
- Elevated corridor proposal opens for a major stretch to ease congestion, feasibility study for Asaf Ali Marg
